Friday, November 21, 2008

Field Report Friday November 21, 2008

Friday November 21, 2008
NWS Chester;
This Afternoon: Rain and snow showers before 4pm, then a slight chance of snow showers. High near 40. North wind around 11 mph. Chance of precipitation is 80%. Total daytime snow accumulation of 1 to 3 inches possible. Tonight: Partly cloudy, with a low around 24. Northwest wind between 10 and 13 mph.


3rd Street Infrasource trench, stone dust bedding.
3rd and Yarnall PECO transformer on site
3rd Street Infrasource trench; Comcast, Verizon in progress, PECO gas and electric below
3rd Street Comcast and Verizon over PECO gas and electric
3rd and Yarnall transformer location
3rd Street service trench typical
4th Street porch columns
Lot 19 drywall on site
Lot 18 drywall in progress
Lot 17 drywall hung
Lot 16 drywall in progress
Lot 15 drywall finish in progress
Lot 14 drywall finish in progress
Lot 9, 10 & 11 porch concrete in progress
Union at Yarnall stone entry, Union 2A Mod base

Wednesday, November 19, 2008

Field Report Wednesday November 19, 2008

Wednesday November 19, 2008
40's F during day, 20's F overnight dry
Forecast 40's to 20's next few days with overnight lows below freezing through the end of the weekend, and above freezing next week.


Lot 7 finish electric in progress
Lot 6 finish electric in progress
Lot 5 finish electric in progress
Lot 4 finish electric in progress
Lot 3 finish electric in progress
Lot 2 finish electric in progress
Lot 1 finish electric in progress
Jeffery Street paving patch concrete
Jeffery Street paving patch concrete
3rd Street paving patch concrete
3rd Street lots 20, 21 & 22 porch columns in progress
3rd Street electric conduit typical

Tuesday, November 18, 2008

Field Report Tuesday November 18, 2008

Tuesday Novenber 18, 2008

30' F during day, high 20's F overnight flurries.

Forecast 30's to 20's with flurries next 5 days, with rain and overnight temps above freezing after weekend.
3rd Street PECO gas service typical, dryer vent to be relocated 3rd Street Infrasource trench fromYarnall, stone dust bedding 3rd Street gas shut-off location 3rd Street Infrasource trench from Jeffery 3rd and Jeffery inlet protection Lot 19 drywall on site Lot 18 drywall on site Lot 17 drywall on site Lot 16 drywall on site Lot 15 drywall hung Lot 14 drywall hung Lot 13 rough mechanicals complete Lot 12 rough mechanicals complete Lot 11 rough mechnicals complete Lot 10 rough mechanicals complete Lot 9 rough electric in progress Lot 8 rough electric in progress

Friday, November 14, 2008

Field Report Friday November 14, 2008

Friday November 14, 2008
50's during day, 50's F overnight rain on Thursday, mist and drizzle on Friday
Forecast 60's and 50's with rain over the week end, 40's next week dry with overnight lows in the high 20's.

Lot 14 insulation complete, drywall in progress
Lot 15 insulation complete drywall in progress
Lot 16 insulation complete
Lot 17 insulation complete
Lot 18 insulation complete
Lot 19 insulation complete
Jeffery Street at Union Street new gas main
New gas main on site at Union (adjacent to lot 8)
4th Street lots 7 through 1
3rd Street and Union Street rear, excavation for infiltration basin in progress
3rd Street Infrasource trench from Yarnall
3rd Street Infrasource trench from Jeffery

3rd Street lots 20 through 26