Wednesday April 29, 2009
Today Showers Likely Hi 61 °F
Tonight Mostly Cloudy Lo 42 °F
Thursday Slight Chc Showers Hi 64 °F
Thursday Night Chance Showers Lo 53 °F
Friday Chance Tstms Hi 79 °F
Friday Night Showers Likely Lo 58 °F
Saturday Tstms Likely Hi 76 °F
Saturday Night Chance Tstms Lo 54 °F
Sunday Chance Showers Hi 70 °F
Official opening by City of Chester Mayor Butler
New homeowners moves-in lots 20, 21, 22 & 23
Mayor Butler
Wednesday, April 29, 2009
Tuesday, April 28, 2009
Field Report Tuesday April 28, 2009
Tuesday April 28, 2009
Today Sunny Hi 90 °F
Tonight Tstms Likely Lo 58 °F
Wednesday Showers Likely Hi 62 °F
Wednesday Night Chance Rain Lo 50 °F
Thursday Chance Rain Hi 62 °F
Thursday Night Rain Likely Lo 54 °F
Friday Chance Tstms Hi 78 °F
Friday Night Chance Showers Lo 58 °F
Saturday Tstms Likely Hi 77 °F
3rd Street lots 25 & 26 substantially complete, punch list available by request in comment section.
3rd Street, CWA contractor final street paving repair
3rd Street, CWA contractor street paving final repair
4th Street lot 6 infrasource utility trench in progress
Today Sunny Hi 90 °F
Tonight Tstms Likely Lo 58 °F
Wednesday Showers Likely Hi 62 °F
Wednesday Night Chance Rain Lo 50 °F
Thursday Chance Rain Hi 62 °F
Thursday Night Rain Likely Lo 54 °F
Friday Chance Tstms Hi 78 °F
Friday Night Chance Showers Lo 58 °F
Saturday Tstms Likely Hi 77 °F
3rd Street lots 25 & 26 substantially complete, punch list available by request in comment section.
3rd Street, CWA contractor final street paving repair
3rd Street, CWA contractor street paving final repair
4th Street lot 6 infrasource utility trench in progress
Monday, April 27, 2009
Field Report Monday April 27, 2009
Monday April 27, 2009
3rd day above 90 deg F, heatwave.
Today Sunny Hi 92 °F
Tonight Clear Lo 65 °F
Tuesday Sunny Hi 88 °F
Tuesday Night Chance Tstms Lo 60 °F
Wednesday Chance Showers Hi 68 °F
Wednesday Night Slight Chc Showers Lo 50 °F
Thursday Partly Sunny Hi 63 °F
Thursday Night Chance Tstms Lo 53 °F
Friday Chance Tstms Hi 72 °F
Substantial complete lot 22 & 23 this day, substantial complete punch list by request in comment section.
3rd Street storm doors, extra to contract, in progress.
3rd Street lots 23 through 26
3rd day above 90 deg F, heatwave.
Today Sunny Hi 92 °F
Tonight Clear Lo 65 °F
Tuesday Sunny Hi 88 °F
Tuesday Night Chance Tstms Lo 60 °F
Wednesday Chance Showers Hi 68 °F
Wednesday Night Slight Chc Showers Lo 50 °F
Thursday Partly Sunny Hi 63 °F
Thursday Night Chance Tstms Lo 53 °F
Friday Chance Tstms Hi 72 °F
Substantial complete lot 22 & 23 this day, substantial complete punch list by request in comment section.
3rd Street storm doors, extra to contract, in progress.
3rd Street lots 23 through 26
Tuesday, April 21, 2009
Field Report Tuesday April 21, 2009
Tuesday April 21, 2009
Today Chance Tstms Hi 68 °F
Tonight Chance Tstms Lo 48 °F
Wednesday Scattered Tstms Hi 60 °F
Wednesday Night Isolated Tstms Lo 40 °F
Thursday Breezy Hi 61 °F
Thursday Night Mostly Clear Lo 43 °F
Friday Sunny Hi 71 °F
Friday Night Partly Cloudy Lo 54 °F
Saturday Mostly Sunny Hi 82 °F
Substantial Complete Punch List Inspection for lots 20 and 21 this day, punch list by request in comments section.
Union Street infrasource utilities in progress.
Union Street northside
Union Street northside utility junction box
Today Chance Tstms Hi 68 °F
Tonight Chance Tstms Lo 48 °F
Wednesday Scattered Tstms Hi 60 °F
Wednesday Night Isolated Tstms Lo 40 °F
Thursday Breezy Hi 61 °F
Thursday Night Mostly Clear Lo 43 °F
Friday Sunny Hi 71 °F
Friday Night Partly Cloudy Lo 54 °F
Saturday Mostly Sunny Hi 82 °F
Substantial Complete Punch List Inspection for lots 20 and 21 this day, punch list by request in comments section.
Union Street infrasource utilities in progress.
Union Street northside
Union Street northside utility junction box
Wednesday, April 15, 2009
Field Report Wednesday April 15, 2009
Wednesday April 15, 2009
Today Rain Hi 50 °F
Tonight Chance Showers Lo 38 °F
Thursday Sunny Hi 61 °F
Thursday Night Mostly Clear Lo 41 °F
Friday Sunny Hi 70 °F
Friday Night Mostly Clear Lo 48 °F
Saturday Sunny Hi 73 °F
Saturday Night Partly Cloudy Lo 50 °F
Sunday Partly Sunny Hi 64 °F
Union Street Infrasource conduit roughed to 3rd and Yarnall Street
3rd Street prep for street paving at curb in progress
Today Rain Hi 50 °F
Tonight Chance Showers Lo 38 °F
Thursday Sunny Hi 61 °F
Thursday Night Mostly Clear Lo 41 °F
Friday Sunny Hi 70 °F
Friday Night Mostly Clear Lo 48 °F
Saturday Sunny Hi 73 °F
Saturday Night Partly Cloudy Lo 50 °F
Sunday Partly Sunny Hi 64 °F
Union Street Infrasource conduit roughed to 3rd and Yarnall Street
3rd Street prep for street paving at curb in progress
Wednesday, April 8, 2009
Project Meeting Wednesday April 8, 2009
Project Meeting Wednesday April 8, 2009
Today Slight Chc Sprinkles Hi 53 °F
Tonight Mostly Cloudy Lo 39 °F
Thursday Mostly Sunny Hi 63 °F
Thursday Night Partly Cloudy Lo 44 °F
Friday Chance Rain Hi 57 °F
Friday Night Rain Likely Lo 45 °F
Saturday Chance Rain Hi 54 °F
Saturday Night Mostly Cloudy Lo 36 °F
Sunday Sunny Hi 55 °F
75% complete houses,
76% complete sitework,
Payment voucher approved and signed
Attendance;
James Thomas; Union Square Homes
Harold Thomas; Union Square Homes
Dan Thomer; WDC Construction
Kevin Maguire; for TRF
Colin Dawson RA; CDRA
John Paczewski; PHFA
Lisa Gaffney; CEDA
Harry Ackroyd; R&V for OHCD
George Troilo; OHCD
Distribution all in attendance and;
Assistant Director, Linda Hill; OHCD
Michael Washington; OHCD
Edward Koehler PE; R&V for OHCD
Jihad Ali ; Union Square Homes
Progress;
Please note use of the term "installed" does not include tested, inspected or approved by utility provider or public agency.
3rd Street
Sidewalk and driveway installed
Site utilities complete and energized, with exception of Verizon Vios final run to service connection at Union and Jeffery.
Trench for infrasource and Verizon conduit Union Street north side and Yarnall Street in progress.
Front yard sod in progress.
Union Street
House sanitary sewer laterals to proposed Union Street sewer main location installed.
Ambric/DELCORA/City Engineer in review of proposal to relocate proposed sewer location to avoid conflict with PECO conduit at Union and Jeffery.
Trenching for PECO gas and electric conduit, Verizon conduit and Comcast conduit in progress, including sections of conduit.
4th and Union Infiltration Basin
Infiltration Basin installed including; house storm sewer laterals and 15" concrete storm sewer to 3rd and Union infiltration basin manhole.
Yarnall Street
Curbing removed, roadway sawcut for new curb installation
Trees
WDC to provide CEDA with tree selection from previously presented list, and schedule for planting including locations.
Homeowner manual
WDC to prepare homeowner manual including maintenance item guidance.
Lot 1 through 7
Porch finish work and siding in progress, (no end gable trim board).
Finish electric installed (not energized)
Lot 8 through 13
Porch end gable siding installed without 15# bit felt or house wrap base, (no end gable trim board)
Lot 14 through 19
Porch end gable siding installed without 15# bit felt or house wrap base, (no end gable trim board)
Rear concrete pads in progress garage and patio doors, (no mechanical tie to house foundation wall, soil may not be fully compacted)
Lot 20 through 26
Utilities energized with exception of Verizon Vios.
Carpet installed.
WDC punch list work in progress
Rear concrete pads in progress garage and patio doors, (no mechanical tie to house foundation wall, soil may not be fully compacted)
Next project meeting 1:30 PM Wednesday May 13, 2009 to be confirmed.
http://unionsquarechesterpa.blogspot.com/ for images and prior meeting and field reports.
3rd Street sod in progress
3rd Street top soil for sod
Yarnall Street infrasource trench in progress
Union Street utility conduit in progress
Union Street southside rear concrete pad prep and form
Today Slight Chc Sprinkles Hi 53 °F
Tonight Mostly Cloudy Lo 39 °F
Thursday Mostly Sunny Hi 63 °F
Thursday Night Partly Cloudy Lo 44 °F
Friday Chance Rain Hi 57 °F
Friday Night Rain Likely Lo 45 °F
Saturday Chance Rain Hi 54 °F
Saturday Night Mostly Cloudy Lo 36 °F
Sunday Sunny Hi 55 °F
75% complete houses,
76% complete sitework,
Payment voucher approved and signed
Attendance;
James Thomas; Union Square Homes
Harold Thomas; Union Square Homes
Dan Thomer; WDC Construction
Kevin Maguire; for TRF
Colin Dawson RA; CDRA
John Paczewski; PHFA
Lisa Gaffney; CEDA
Harry Ackroyd; R&V for OHCD
George Troilo; OHCD
Distribution all in attendance and;
Assistant Director, Linda Hill; OHCD
Michael Washington; OHCD
Edward Koehler PE; R&V for OHCD
Jihad Ali ; Union Square Homes
Progress;
Please note use of the term "installed" does not include tested, inspected or approved by utility provider or public agency.
3rd Street
Sidewalk and driveway installed
Site utilities complete and energized, with exception of Verizon Vios final run to service connection at Union and Jeffery.
Trench for infrasource and Verizon conduit Union Street north side and Yarnall Street in progress.
Front yard sod in progress.
Union Street
House sanitary sewer laterals to proposed Union Street sewer main location installed.
Ambric/DELCORA/City Engineer in review of proposal to relocate proposed sewer location to avoid conflict with PECO conduit at Union and Jeffery.
Trenching for PECO gas and electric conduit, Verizon conduit and Comcast conduit in progress, including sections of conduit.
4th and Union Infiltration Basin
Infiltration Basin installed including; house storm sewer laterals and 15" concrete storm sewer to 3rd and Union infiltration basin manhole.
Yarnall Street
Curbing removed, roadway sawcut for new curb installation
Trees
WDC to provide CEDA with tree selection from previously presented list, and schedule for planting including locations.
Homeowner manual
WDC to prepare homeowner manual including maintenance item guidance.
Lot 1 through 7
Porch finish work and siding in progress, (no end gable trim board).
Finish electric installed (not energized)
Lot 8 through 13
Porch end gable siding installed without 15# bit felt or house wrap base, (no end gable trim board)
Lot 14 through 19
Porch end gable siding installed without 15# bit felt or house wrap base, (no end gable trim board)
Rear concrete pads in progress garage and patio doors, (no mechanical tie to house foundation wall, soil may not be fully compacted)
Lot 20 through 26
Utilities energized with exception of Verizon Vios.
Carpet installed.
WDC punch list work in progress
Rear concrete pads in progress garage and patio doors, (no mechanical tie to house foundation wall, soil may not be fully compacted)
Next project meeting 1:30 PM Wednesday May 13, 2009 to be confirmed.
http://unionsquarechesterpa.blogspot.com/ for images and prior meeting and field reports.
3rd Street sod in progress
3rd Street top soil for sod
Yarnall Street infrasource trench in progress
Union Street utility conduit in progress
Union Street southside rear concrete pad prep and form
Wednesday, April 1, 2009
Field Report Wednesday April 1, 2009
Wednesday April 1, 2009
Today Showers Hi 55 °F
Tonight Rain Lo 43 °F
Thursday Patchy Fog Hi 65 °F
Thursday Night Chance Showers Lo 46 °F
Friday Tstms Likely Hi 61 °F
Friday Night Chance Showers Lo 44 °F
Saturday Mostly Sunny Hi 61 °F
Saturday Night Mostly Clear Lo 42 °F
Sunday Mostly Sunny Hi 65 °F
3rd Street; lots 20 through 26, WDC punch list in progress
Union Street; utility conduit and curb inlet in progress
3rd Street
Today Showers Hi 55 °F
Tonight Rain Lo 43 °F
Thursday Patchy Fog Hi 65 °F
Thursday Night Chance Showers Lo 46 °F
Friday Tstms Likely Hi 61 °F
Friday Night Chance Showers Lo 44 °F
Saturday Mostly Sunny Hi 61 °F
Saturday Night Mostly Clear Lo 42 °F
Sunday Mostly Sunny Hi 65 °F
3rd Street; lots 20 through 26, WDC punch list in progress
Union Street; utility conduit and curb inlet in progress
3rd Street
Subscribe to:
Posts (Atom)