Friday, August 28, 2009

Field Report Friday August 28, 2009

Friday August 28, 2009

This Afternoon Heavy Rain Hi 78 °F
Tonight Heavy Rain Lo 69 °F
Saturday Showers Likely Hi 84 °F
Saturday Night Chance Tstms Lo 69 °F
Sunday Chance Tstms Hi 83 °F
Sunday Night Slight Chc Tstms Lo 63 °F
Monday Partly Sunny Hi 77 °F
Monday Night Partly CloudyLo 60 °F
Tuesday Mostly Sunny Hi 75 °F

Union Street asphalt paving binder course installed
CWA on site installing water meters.

Union Street

Wednesday, August 26, 2009

Project Meeting Wednesday August 26, 2009

Project Meeting Wednesday August 26, 2009

Today Sunny Hi 89 °F
Tonight Mostly Cloudy Lo 68 °F
Thursday Partly Sunny Hi 84 °F
Thursday Night Chance Showers Lo 66 °F
Friday Chance Tstms Hi 79 °F
Friday Night Chance Tstms Lo 67 °F
Saturday Chance Tstms Hi 79 °F
Saturday Night Chance Tstms Lo 68 °F
Sunday Chance Tstms Hi 82 °F

94% complete houses,
92% complete infrastructure / sitework

Payment vouchers approved and signed

Attendance;
James Thomas; Union Square Homes
Harold Thomas; Union Square Homes
Dan Thomer; WDC Construction
Kevin Maguire; for TRF
Colin Dawson RA; CDRA
Jihad Ali; Union Square Homes
Harry Ackroyd; R&V for OHCD
Charles Catania PE; Catania Eng/City Engineer
Lisa Gaffney; CEDA
George Troilo; OHCD

Distribution all in attendance and;
John Paczewski; PHFA
Assistant Director, Linda Hill; OHCD
Michael Washington; OHCD
Edward Koehler PE; R&V for OHCD
Joe Mulvahill; Ambric Technologies

Progress;Please note use of the term "installed" or "complete" does not include tested, inspected or approved by utility provider or public agency.

SITE

3rd Street
-Substantially complete

4th Street
-Substantially complete

Yarnall Street
-Curbs and sidewalk installed
-Storm inlets installed, Union northside vand Yarnall cold patch, Union southside and Yarnall steelplate.

Jeffery Street
-Sanitary sewer complete
Curbs and sidewalk installed

Union Street
-Slip form curb installed, sidewalks and driveways installed
-Curb inlets installed
-Sanitary sewer installed and house laterals
-CWA main installed and laterals to meter pits
-Infrasource gas, electric, telecom installed to meter locations
-Road grade stone base in progress

Trees;
-WDC reports tree planting after September 15, 2009

Mail Boxes;
-Not yet resolved

Fence;
-Union Square Homes reports agreement with homeowners association in progress for fence installation.

Houses;

Lot 1 through 7
-Substantial complete lots

Lot 8 through 13
-Finish electric complete
-Finish HVAC complete (condensers installed closer to homeowner move in
-Finish plumbing in progress
-Kitchen cabinets, counter and flooring complete
-Bathrooms complete including tile

Lot 14 through 19
-WDC punch list prior to carpet in progress

Lot 20 through 26
-Substantial complete

This is the final project meeting, progress report will be issued until all houses and site work is substantially complete. WDC anticipates substantial complete by end of September 2009.

http://unionsquarechesterpa.blogspot.com/ for images and prior meeting and field reports.



Union Street subgrade stone base in progress, binder asphalt paving Thursday August 27, 2009.

Monday, August 24, 2009

Field Report Monday August 24, 2009

Monday August 24, 2009

This Afternoon Isolated Tstms Hi 87 °F
Tonight Mostly Clear Lo 67 °F
Tuesday Sunny Hi 89 °F
Tuesday Night Mostly Clear Lo 71 °F
Wednesday Sunny Hi 92 °F
Wednesday Night Slight Chc Showers Lo 71 °F
Thursday Partly Sunny Hi 83 °F
Thursday Night Mostly CloudyLo 66 °F
Friday Chance Tstms Hi 81 °F

Union Street subgrade prep in progress

Thursday, August 20, 2009

Field Report Thursday August 20, 2009

Thursday August 16, 2009

This Afternoon Heavy Rain Hi 90 °F
Tonight Heavy Rain Lo 73 °F
Friday Chance Tstms Hi 90 °F
Friday Night Tstms Likely Lo 73 °F
Saturday Tstms Likely Hi 86 °F
Saturday Night Chance Tstms Lo 68 °F
Sunday Mostly Sunny Hi 85 °F
Sunday Night Partly Cloudy Lo 65 °F
Monday Mostly Sunny Hi 82 °F

Union Street both sides seeded and straw cover
Tyson layout Union road grade reference stakes in progress
Union southside and Yarnall curb inlet connect to Yarnall combined sewer in progress.
C&C repair Union Street porch concrete cracks in progress

Union northside and Yarnall
Union Street Tyson reference stakes
Union and Yarnall curb inlet connection, concrete encasement at existing brick sewer
Union and Yarnall inlet connection
Union and Yarnall PA 3B fill delivered
Union and Yarnall inlet fill compaction
Union and Yarnall fill lift

Tuesday, August 18, 2009

Field Report Tuesday August 18, 2009

Tuesday August 18, 2009

Today Slight Chc Tstms Hi 92 °F
Tonight Chance Tstms Lo 74 °F
Wednesday Chance Tstms Hi 90 °F
Wednesday Night Chance Tstms Lo 73 °F
Thursday Chance Tstms Hi 88 °F
Thursday Night Chance Tstms Lo 74 °F
Friday Chance Tstms Hi 88 °F
Friday Night Chance Tstms Lo 73 °F
Saturday ChanceTstmsHi 84 °F

CWA completed water service laterals and meter pits.
Union southside and Yarnall curb inlet connect in progress.
Union north and southside top soil and grading for seeding in progress.
Union northside kitchen cabinets installed, vinyl flooring in progress
Union southside, finish electric and finish plumbing in progress.

CWA water service lateral
Union northside top soil in progress
Union CWA on site
Lot 13 kitchen
Lot 12 kitchen
Lot 11 kitchen
Lot 10 kitchen
Lot 9 kitchen
Lot 8 kitchen
Union northside
Union southside
Lot 14 kitchen
Lot 15 kitchen
Lot 16 kitchen
Lot 17 kitchen
Lot 18 kitchen
Lot 19 kitchen
Union southside and Yarnall curb inlet

Friday, August 14, 2009

Field Report Friday August 14, 2009

Friday August 14, 2009

This Afternoon Isolated Tstms Hi 86 °F
Tonight Patchy Fog Lo 65 °F
Saturday Mostly Sunny Hi 88 °F
Saturday Night Partly Cloudy Lo 66 °F
Sunday Sunny Hi 92 °F
Sunday Night Partly Cloudy Lo 68 °F
Monday Mostly Sunny Hi 92 °F
Monday Night Partly Cloudy Lo 68 °F
Tuesday Mostly Sunny Hi 89 °F

Substantial complete inspection requested by WDC this AM for Lot 3, with settlement at noon, insufficient notification to commence inspection prior to settlement. Substantial complete exterior punch list and typical items for interior from other properties, also Substantial Complete for lot 6 previously requested by WDC several days after settlement.

Substantial Complete Inspection report available by request in comment section.

CWA laterals and meters pits set, for lot 8, 13, 14, 17, 18 & 19.

Sidewalk at Union southside and Jeffery installed.

Union northside kitchen cabinet installation in progress.


Union southside and Jeffery

Thursday, August 13, 2009

Field Report Thursday August 13, 2009

Thursday August 13, 2009

Today Tstms Likely Hi 80 °F
Tonight Chance Tstms Lo 67 °F
Friday Chance Tstms Hi 85 °F
Friday Night Partly Cloudy Lo 69 °F
Saturday Mostly Sunny Hi 89 °F
Saturday Night Slight Chc Showers Lo 70 °F
Sunday Mostly Sunny Hi 89 °F
Sunday Night Partly Cloudy Lo 70 °F
Monday Mostly Sunny Hi 88 °F


CWA water laterals and meter pits in progress
Concrete paving at Union southside and Yarnall corner installed
Form and stone base for concrete paving at Union Southside and Jeffery in place

Union southside houses; finish paint in progress
Union northside houses; ceramic tile in progress

Union southside and Yarnall
CWA water laterals and meter pits in progress Union Street
Union southside and Jeffery form and stone base for concrete paving

Monday, August 10, 2009

Field Report Monday August 10, 2009

Monday August 10, 2009

This Afternoon Isolated Tstms Hi 96 °F
Tonight Chance Tstms Lo 77 °F
Tuesday Chance Tstms Hi 90 °F
Tuesday Night Chance Tstms Lo 72 °F
Wednesday Mostly Sunny Hi 87 °F
Wednesday Night Slight Chc Tstms Lo 69 °F
Thursday Partly Sunny Hi 85 °F
Thursday Night Mostly Cloudy Lo 69 °F
Friday Partly Sunny Hi 85 °F

THUNDERSTORMS ON TUESDAY AFTERNOON AND EVENING MAY BE ACCOMPANIED BY STRONG WIND GUSTS, ALONG WITH HEAVY RAIN AND DANGEROUS CLOUD TO GROUND LIGHTNING.

Union southside curb installed, forming and stone base in progress for sidewalk.

Union southside at Jeffery

Wednesday, August 5, 2009

Field Report Wednesday August 5, 2009

Wednesday August 5, 2009

Today Heavy Rain Hi 89 °F
Tonight Tstms Likely Lo 67 °F
Thursday Slight Chc Tstms Hi 85 °F
Thursday Night Partly Cloudy Lo 63 °F
Friday Mostly Sunny Hi 85 °F
Friday Night Slight Chc Tstms Lo 68 °F
Saturday Chance Tstms Hi 85 °F
Saturday Night Mostly Cloudy Lo 72 °F
Sunday Partly Sunny Hi 91 °F

Heavy rain forecast for late afternoon
Slip form curbing Union Street southside completed before noon

Union Street southside at Yarnall
Union Street southside at Jeffery
Union and Jeffery forming to complete curb to previously poured curb at storm inlet

Tuesday, August 4, 2009

Field Report Tuesday August 4, 2009

Tuesday August 4, 2009

Today Isolated Tstms Hi 91 °F
Tonight Isolated Tstms Lo 72 °F
Wednesday Chance Tstms Hi 92 °F
Wednesday Night Chance Tstms Lo 69 °F
Thursday Slight Chc Tstms Hi 86 °F
Thursday Night Slight Chc Tstms Lo 68 °F
Friday Partly Sunny Hi 82 °F
Friday Night Mostly Cloudy Lo 67 °F
SaturdayMostly Sunny Hi 88 °F

Union Street northside;
-trim in progress
-furnace in progress
Union Street southside
-1st floor trim final items in progress
-paint touch-up in progress
-curb stone base compacted and slip form curb guide line in place

Union Street
-CWA tested and sanitized new water main
-Union northside and Yarnal curb inlet compacted fill and cold patch installed.

3rd Street
-Verizon Fios fiber-optic house boxes in progress.


3rd Street Verizon Vios fiber-optic box in progress
Slip form curb guide Union and Yarnall
Union southside curb base
Curb base Union and Jeffery and CWA main test
CWA main test at Yarnall
Union northside and Yarnall curb inlet compacted fill
Curb inlet cold patch
Curb inlet cold patch rolled