Tuesday, December 30, 2008

Field Report Tuesday December 30, 2008

Tuesday December 30, 2008


Today Breezy Hi 45°F
Tonight Slight ChcSnow Lo 30°F
Wednesday Chance Rain/Snow Hi 42°F
Wednesday Night Windy Lo 19°F
New Year's Day Sunny Hi 33°F
Thursday Night Partly Cloudy Lo 25°F
Friday Chance Rain/Snow Hi 41°F
Friday Night Chance Rain/Snow Lo 30°F
Saturday Partly Sunny Hi 38°F



Please periodically check with NWS All Hazards on the Weather Radio setting on your car radio for special weather statements throughout the day.

Construction Manager to hand deliver revised Ambric Technologies drawing set to City Engineer.

3rd Street lots 20 through 26;
-Electric and gas energized
-Cut and replace section of siding at crude repair behind gas meter complete to adjacent inside corner "J".
-Drawings show approx 10" trim board at lower edge of porch roof end half gable, remove siding lower piece and install approx 10" trim board to align with top of brick veneer.
-CWA completed street blacktop repair.

Union Street lots 14 through 19;
-Downspout laterals completed to infiltration tank.
-Trim in progress.
-2nd floor bathroom plumbing repair and removal of ceiling lump at 14, 15, 16 & 17 to be completed.

Union Street lots 8 through 13;
-Miscellaneous framing items in progress including 1st floor bathroom blocking.
-Porch framing in progress.

4th Street lots 1 through 7;
-Not accessed this site visit.

Lot 23 porch end half gable
3rd and Union rear
Lot 14 downspout lateral to infiltration tank
3rd and Union rear
Lot 26 meters
Lot 25 meters
Lot 24 meters
Lot 23 meters
Lot 22 meters
Lot 21 meters
Lot 20 meters
3rd Street lots 20 through 26
Union Street lots 14 through 19
Union Street lots 8 through 13
4th Street, Union Street rear
4th Street lots 1 through 7
Lot 13 bathroom blocking
Lot 13
Lot 12 bathroom blocking
Lot 12
Lot 11 bathroom blocking
Lot 11
Lot 10 bathroom blocking
Lot 10
Lot 9 bathroom block to be installed
Lot 9
Lot 8 bathroom blocking to be installed
Lot 8
Lot 14 ceiling lump to be removed
Lot 15 ceiling lump to be removed
Lot 16 ceiling lump to be removed
Lot 17 ceiling lump to be removed
Lot 18
Lot 19

Friday, December 26, 2008

Field Report Friday December 26, 2008

Friday December 26, 2008


Tonight Rain Likely Lo 38°F
Saturday Chance Rain Hi 55°F
Saturday Night Chance Showers Lo 49°F
Sunday Showers Likely Hi 62°F
Sunday Night Mostly Cloudy Lo 35°F
Monday Mostly Sunny Hi 49°F
Monday Night Partly Cloudy Lo 33°F
Tuesday Mostly Sunny Hi 45°F
Tuesday Night Mostly Cloudy Lo 31°F


3rd and Union Infiltration System
Grading to swale in progress
Lot 20 through 26, downspout laterals installed to infiltration tank
Pipe and manhole on site for stormwater overflow.
Temporary trench cut at Jeffery side of lot 14 to divert rain water.

Roof gutter installation in progress.

Porch framing in progress lots 12 & 13.

Lots 13 through 8
Lots 26 through 20 rear
Lot 20 through 26 front, 3rd Street
Lots 14 through 19, Union Street
3rd and Union rear
Lots 8 through 13, Union Street
Lots 1 through 7, 4th Street

Monday, December 22, 2008

Field Report Monday December 22, 2008

Monday December 22, 2008

Tonight Partly Cloudy Lo 18°F
Tuesday Mostly Sunny Hi 33°F
Tuesday Night Rain/Snow Likely Lo 30°F
Wednesday Rain Likely Hi 51°F
Wednesday Night Showers Likely Lo 39°F
Christmas Day Partly Sunny Hi 47°F
Thursday Night Partly Cloudy Lo 28°F
Friday Chance Showers Hi 46°F
Friday Night Chance Rain Lo 41°F

3rd Street;
DELCORA completed repairs to force main at lot 25 & 26, street perminanent patch in place.
PECO/Infrasource replacing transformer.
PECO/Infrasource to install gas meters after dryer vent relocated.
Billadelphia pump-out at driveway/bollard in progress.

4th Street;
CWA on site.


PECO/Infrasource transformer replace.
3rd Street


Friday, December 19, 2008

Field Report Friday December 19, 2008

Friday December 19, 2008

Today Rain Hi 42°F
Tonight Chance Rain/Snow Lo 32°F
Saturday Cloudy Hi 35°F
Saturday Night Snow Likely Lo 29°F
Sunday Rain/Sleet Hi 41°F
Sunday Night Chance Flurries Lo 22°F
Monday Chance Flurries Hi 32°F
Monday Night Partly Cloudy Lo 19°F
Tuesday Mostly Sunny Hi 35°F



3rd Street lots 26, 25 & 24 porch column trim in progress


Jason for Billadelphia reinstalled stone and filter at 3rd Street curb inlets and as requested by Dennis Razc installed stone silt filter at Union Street site entries. Billadelphia crew sweeping streets.


Union entry at Jeffery

Union entry at Yarnall

Stone and filter at 3rd and Jeffery inlet


Stone and filter at 3rd and Yarnall inlet
Lots 26, 25 and 24 porch column trim in progress

Thursday, December 18, 2008

Field Report Thursday December 18, 2008

Thursday December 18, 2008

Tonight Chance Rain Lo 34°F
Friday Rain/Sleet Hi 41°F
Friday Night Wintry Mix Lo 32°F
Saturday Wintry Mix Hi 34°F
Saturday Night Wintry Mix Lo 29°F
Sunday Rain/Sleet Hi 41°F
Sunday Night Chance Flurries Lo 22°F
Monday Chance Flurries Hi 32°F
Monday Night Partly Cloudy Lo 19°F

3rd Street lots 20 through 26 gas meter bollards in progress
4th Street lots 1 through 7 porch roof shingles installed
Union Street lots 14, 15, 18 & 19 porch roof framimg complete, 17 in progress



Union Street lots 19 through 14
3rd Street lots 1 through 7